Technology Construction Hospitality Contact

The Future, Built Today.

A multi-sector conglomerate driving innovation in construction, technology, and hospitality across East Africa.

Explore Our Ecosystem Get in Touch
01 Fundi Kiganjani Launching Soon
02 3D Concrete Printing Q1 2027
03 Tours & Hotels In Development

Technology

Digital platforms connecting skilled professionals with the people who need them. Our flagship product, Fundi Kiganjani, is a verified marketplace for on-demand technicians across Tanzania.

Construction

3D concrete printing technology for sustainable, affordable, and high-precision housing built in record time. We are bringing additive manufacturing to the East African construction sector.

Hospitality

The first lodges and hotels in the region constructed using 3D printing, blending futuristic architecture with the natural landscapes of the Tanzanian Safari circuit.

Launching Soon

Fundi Kiganjani

A digital marketplace connecting skilled, verified technicians with households and businesses across Tanzania. Search by problem, not by trade. Our AI-powered matching finds the right fundi for the job, verified and rated by the community.

Verified Profiles

Every technician is background-checked and skill-verified before joining the platform.

Problem Matching

Describe your issue in plain language. We match you with the right specialist.

Real-Time Tracking

Know where your fundi is and when they will arrive. Full visibility from booking to completion.

Community Ratings

Transparent reviews from real customers help you choose with confidence.

App Store / Coming Soon
Google Play / Coming Soon
Fundi Kiganjani
Find a technician near you
John M. / Plumber
4.9
Amina K. / Electrician
4.8
Hassan R. / AC Repair
5.0
Grace W. / Painter
4.7
Bakari S. / Carpenter
4.9
Book a Fundi
Project Launch Q1 2027

3D Concrete Printing

Pioneering the future of housing in Tanzania. We use industrial-scale 3D printing technology to build sustainable, affordable, and structurally precise homes. Walls are printed layer by layer using specially formulated concrete, reducing manual labour, material waste, and construction timelines by orders of magnitude.

70%

Faster Build Time

40%

Less Material Waste

24hr

Wall Printing Cycle

Industrial 3D concrete printer extruding layers of concrete to form building walls
01

Design & Engineering

Architectural plans are converted to precise digital models optimized for layer-by-layer printing.

02

Foundation & Setup

Traditional foundation work is completed. The gantry printer is assembled and calibrated on site.

03

3D Wall Printing

Concrete is extruded in continuous layers, forming walls with integrated channels for plumbing and electrical.

04

Finishing & Handover

Roofing, interior finishing, and quality inspection. The structure is ready for occupancy.

In Development

A New Standard in Hospitality

Our upcoming lodges and hotels will be the first in the region built using our proprietary 3D construction technology. Each property blends futuristic, organic architecture with the surrounding landscape, offering guests an experience found nowhere else on the continent.

  • 3D-printed structures with organic, freeform geometry
  • Sustainable construction with minimal site disruption
  • Integrated with Tanzania's northern Safari circuit
  • Lower build cost passed through as guest value
  • Each lodge designed as a one-off, never duplicated

3D-Printed Architecture

Elleanna Vision Render
Elleanna 3D-printed luxury lodge concept
5,302 ft2

Floor Area

14 days

Print Time

100yr

Structure Life

Why We Build Differently

01

East Africa First

Every product and service we build is designed for the realities of this region. Not adapted from elsewhere, but created here.

02

Technology as Infrastructure

We treat technology not as a product layer but as foundational infrastructure. Our platforms are built to serve millions, not thousands.

03

Vertical Integration

From the app that books the technician to the 3D printer that builds the hotel, we control the full chain. This is how quality and cost are managed.

04

Long-Term Commitment

We are not building for a quick exit. Our projects are multi-year, capital-intensive investments in Tanzania's physical and digital infrastructure.

Get in Touch

Office
Kanisa Road, Uzunguni Area, House No.14
P.O. Box 16438
Arusha, Tanzania